Belgium is incorporated into the DIgSILENT GridCode 2019 database
Publicado el 6 de Febrero de 2019
The "PROPOSAL FOR NC RFG REQUIREMENTS OF GENERAL APPLICATION" is the Belgian TSO proposal at Federal level following Art. 7(4) of the NC RfG from ENTSO-e. It was published on the 17th May 2018.
The final proposal has been incorporated now in DIgSILENT GridCode 2019. Visit the Elia website for detailed information.
Etiquetas: Belgium, Grid Code, ENTSO-e, 2016/631, RfG, compliance, verification, TSO, grid connection requirements, gensets, performance monitoring